HID Awolowo Estate is a 76-unit development including 2 and 3 bedroom semi-detached bungalows, 3-bedroom fully detached bungalows, 4 bedroom duplexes, and a block of 6 units of 2 and 3 bedroom flats on a 3.5 hectares of land.
Units were constructed using the traditional method of sandcrete blocks alongside a building technology piloted to cut construction time and cost. Time reduction was about 40% and cost reduction at 15% compared with traditional building methods. The estate was built using multiple task management models and a strong team of on-site management and oversight.
CATEGORY: Residential
STATUS: Completed
LOCATION: Abeokuta, Ogun State
SERVICES: Real Estate Advisory
PROJECT DURATION: 12 months
PROJECT VALUE: N800 million
AAK Degun Mitros Estate is a 160 unit affordable housing development. Sitting on a 4.5hectare site, the efficient layout ensured that the delivery of infrastructure and services was at the lowest cost per unit possible.
With a single, central spine road (with off-lane parking), own water supply system, and dedicated power stations, the project was delivered at less than N55, 000/sqm. The mix of house types includes 2 bedroom flats, 2 bedroom semi-detached bungalows, and 3 bedroom semi-detached bungalows. Over 45 Task Managers (TM) (local, small-scale contractors) were assembled and trained following an extensive pre-qualification exercise. Each TM was allocated one or two units. All 112 bungalows were roofed in 9 weeks. Bulk procurement also contributed to the cost gains.
CATEGORY: Affordable Housing
STATUS: Completed
LOCATION: Abeokuta, Ogun State
SERVICES: Real estate advisory
PROJECT DURATION: 8 months
PROJECT VALUE: 900 Million